• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 19. Radiator Cooling Fins.
Figure 22. Fuel/Water Separator.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  467    468    469    470    471  472  473    474    475    476    477  
img
. .
TM 5-3820-276-10-2
0201
Table 4.
PMCS - PAC - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
WWDS00020
Figure 20. Engine Coolant.
NOTE
9
Before
Muffler and
Exhaust Pipe
Operating equipment with any exhaust
leaks may violate AR 385-55 (WP 0230).
1. Inspect exhaust pipe (Figure 21, Item 1) and rain
Any damage or leak
cap (Figure 21, Item 2) for damage.
evident. Notify
maintenance.
1
2
3
WWDS00206
Figure 21. Muffler and Exhaust Pipe.
2. Inspect muffler (Figure 21, Item 3) for evidence of
Any damage or leak
leaks.
evident. Notify
maintenance.
0201-15
02/13/2013root(pmcswp)wpno(I30001)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.