• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 36. Fuel Level.
Figure 38. Fuel Level.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  479    480    481    482    483  484  485    486    487    488    489  
img
.
TM 5-3820-276-10-2
0201
Table 5.
PMCS - PAC - During Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
2
WWDS00018
Figure 37. Compressor Sight Glass.
Table 6.
PMCS - PAC - After Drilling Equipment Operation.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
After
Fuel Level
Check FUEL LEVEL gauge (Figure 38, Item 1). Add
clean JP-8/DF2 diesel fuel as required (Volume 1,
WP 0056).
0201-27
02/13/2013root(pmcswp)wpno(I30001)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.