• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Grounding Rod/Clamp Removal
Figure 2. Mud Pump Hose Disconnect (View 1).

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  578    579    580    581    582  583  584    585    586    587    588  
img
. . .
TM 5-3820-276-10-1
0055
OPERATOR MAINTENANCE
POST OPERATION PROCEDURES - MUD CLEANING SYSTEM (MCS)
INITIAL SETUP:
Personnel Required
Equipment Condition
Three
Engine off (WP 0050)
WATER TANK DRAINING
1.
Remove drain plug (Figure 1, Item 3) from water tank (Figure 1, Item 2) to drain mud mix.
1
2
3
WWDS00095
Figure 1.
Water Tank Drain Plug.
CAUTION
Do not let mud or sand stand in the tank for long periods of time. The mud will not dry and
will cause rust to form in large areas. Failure to comply may result in damage to the
equipment.
2.
Rinse shaker screens (Figure 1, Item 1) and water tank (Figure 1, Item 2) with clean water.
3.
Install drain plug (Figure 1, Item 3) to water tank (Figure 1, Item 2).
END OF TASK
0055-1
02/13/2013root(opusualwp)wpno(O40009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.