TM 5-3820-276-10-1
OPERATOR MAINTENANCE
MAIN 18K WINCH (JIB) OPERATION - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Personnel Required
Equipment Condition
Two
18K MAIN WINCH (JIB) OPERATION
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
NOTE
When using jib for casing operations at maximum capacity, jib arm must be lowered
completely down and positioned over hole.
1.
If required, push FAST FEED control (Figure 1, Item 5) forward to raise tophead (Figure 1, Item 1) to top of
derrick.
0019-1
02/13/2013root(opusualwp)wpno(O10006)