• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HOSE INSTALLATION TO STANDPIPE - Continued
Figure 2. Sandline

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  185    186    187    188    189  190  191    192    193    194    195  
img
. . .
TM 5-3820-276-10-1
0018
OPERATOR MAINTENANCE
AUXILIARY WINCH (SANDLINE) OPERATION - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Personnel Required
Equipment Condition
Two
WWDR fully setup (WP 0017)
SANDLINE OPERATION
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
1.
Push FAST FEED lever (Figure 1, Item 3) forward to raise tophead (Figure 1, Item 1) to top of derrick.
1
2
3
WWDS00377
Figure 1.
Tophead Operation.
2.
Set TOP SLIDE switch (Figure 1, Item 2) right to move tophead (Figure 1, Item 1) outward.
0018-1
02/13/2013root(opusualwp)wpno(O10005)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.