Figure 2. Sandline
MAIN 18K WINCH (JIB) OPERATION - WATER WELL DRILLING RIG (WWDR)

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  187    188    189    190    191  192  193    194    195    196    197  
img
TM 5-3820-276-10-1
0018
SANDLINE OPERATION - Continued
4.
With aid of assistant, set SANDLINE switch (Figure 2, Item 1) right to move sandline cable and hook
(Figure 2, Item 3) right.
5.
With aid of assistant, pull sandline winch control (Figure 2, Item 2) back to lower sandline cable and hook
(Figure 2, Item 3).
6.
With aid of assistant, push sandline winch control (Figure 2, Item 2) forward to raise sandline cable and
hook (Figure 2, Item 3).
END OF TASK
END OF WORK PACKAGE