TM 5-3820-276-10-1
OPERATOR MAINTENANCE
FRONT BUMPER WINCH OPERATION - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Personnel Required
References
Two
ENGAGE P.T.O.
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
1.
2.
If required, place gearshift lever (Figure 1, Item 3) in Neutral.
2
3
5
6
1
4
7
WWDS00086
Figure 1.
Front Bumper Mounted Winch Controls Location.