TM 10-4320-307-24
2-30
FIELD INSTRUMENT LAYOUT TEST/REPAIR/REPLACE (CONT).
7.
Install pump suction transmitter wiring in flexible conduit and solder wires to connector J2 (10). Remove tags.
8.
Position cable to bracket (11) and secure using nut (12).
9.
Position pump suction transmitter (13) on suction transducer valve (14) and secure using nut (15).
10. Install connector J2 (10) on junction box JB1 (9).
11. Install pump delivery pressure transmitter wiring in flexible conduit and solder wires to connector J1 (16). Remove
tags.
12. Position cable to bracket (11) and secure using nut (17).
13. Position pump delivery pressure transmitter (18) on discharge transducer valve (19) and secure using nut (20).
14. Install connector J1 (16) on junction box JB1 (9).
2-111