Figure 10. Manhole Cover and Bracket Installation.
TANK WALKWAY REPLACEMENT - Continued

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  1031    1032    1033    1034    1035  1036  1037    1038    1039    1040    1041  
img
. . . . . .
TM 5-3825-270-23&P
0191
FIELD MAINTENANCE
TANK WALKWAY REPLACEMENT
INITIAL SETUP:
References
Tools and Special Tools
Parts Manual (WP 0220) Figure 4049
Tool Kit, General Mechanic's: Automotive
(WP 0225, Table 1, Item 12)
Equipment Condition
Materials/Parts
Folding hand rail assembly removed. (WP 0185)
Locknut (WP 0226, Table 1, Item 40) Qty: 5
Personnel Required
Construction Equipment Repairer 91L (2)
REMOVAL
1.
Remove four locknuts (Figure 1, Item 4), screws (Figure 1, Item 2), and washers (Figure 1, Item 3) from upper
walkway (Figure 1, Item 1) and weldment (Figure 1, Item 5). Discard locknuts.
1
1
6
7
5
2, 3, 4
9
8
Figure 1. Tank Walkway Removal.
2.
Remove nut (Figure 1, Item 7), screw (Figure 1, Item 8), and washer (Figure 1, Item 6) from upper walkway
(Figure 1, Item 1) and weldment (Figure 1, Item 9).