• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TANK WALKWAY REPLACEMENT
TANK WALKWAY REPLACEMENT - Continued

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  1032    1033    1034    1035    1036  1037  1038    1039    1040    1041    1042  
img
.
TM 5-3825-270-23&P
0191
REMOVAL - Continued
WARNING
Hand rail components are heavy. Use the aid of an assistant when moving and supporting
assembly during removal and installation. Failure to comply may result in serious injury or
death of personnel.
3.
With the aid of an assistant, remove upper walkway (Figure 1, Item 1) from weldments (Figure 1, Item 5) and
(Figure 1, Item 9).
END OF TASK
INSTALLATION
WARNING
Hand rail components are heavy. Use the aid of an assistant when moving and supporting
assembly during removal and installation. Failure to comply may result in serious injury or
death of personnel.
1.
With the aid of an assistant, position upper walkway (Figure 2, Item 1) on weldments (Figure 2, Item 5) and
(Figure 2, Item 9).
1
1
6
7
5
2, 3, 4
9
8
Figure 2.
2.
Install four screws (Figure 2, Item 2), washers (Figure 2, Item 3), and locknuts (Figure 2, Item 4) onto upper
walkway (Figure 2, Item 1) and weldment (Figure 2, Item 5).
0191-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.