TM 5-3825-270-23&P
0166
INSTALLATION - Continued
2
3
4
1
6
5
Figure 11.
7.
Install nozzle (Figure 11, Item 4) on elbow (Figure 11, Item 1).
8.
Tighten three collars (Figure 11, Item 2) and six set screws (Figure 11, Item 3).
9.
Repeat Steps (1) through (8) for right side.
END OF TASK
FOLLOW-ON MAINTENANCE
END OF TASK
END OF WORK PACKAGE