TM 5-3825-270-23&P
0162
INSTALLATION - Continued
1
2
Figure 10. Rear Platform Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install flusher nozzles and air actuators. (WP 0166)
2.
3.
4.
Install folding hand rail assembly. (WP 0185)
5.
6.
7.
8.
END OF TASK
END OF WORK PACKAGE