• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Air Valve Cover Plate Installation.
Figure 2. Rear Platform Screen Installation.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  913    914    915    916    917  918  919    920    921    922    923  
img
. . . . .
TM 5-3825-270-23&P
0165
FIELD MAINTENANCE
REAR PLATFORM SCREEN REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Tool Kit, General Mechanic's: Automotive
Construction Equipment Repairer 91L (2)
(WP 0225, Table 1, Item 12)
References
Materials/Parts
Parts Manual (WP 0220) Figure 4016
Locknut (WP 0226, Table 1, Item 57) Qty: 5
REMOVAL
Remove five locknuts (Figure 1, Item 1), washers (Figure 1, Item 2), screws (Figure 1, Item 3), washers (Figure
1, Item 4), and rear platform screen (Figure 1, Item 5) from rear module (Figure 1, Item 6). Discard locknuts.
1, 2, 3, 4
5
6
Figure 1. Rear Platform Screen Removal.
END OF TASK
INSTALLATION
Install rear platform screen (Figure 2, Item 5) on rear module (Figure 2, Item 6) with five washers (Figure 2,
Item 4), screws (Figure 2, Item 3), washers (Figure 2, Item 2), and locknuts (Figure 2, Item 1).
0165-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.