TM 5-3825-270-23&P
0134
INSTALLATION - Continued
area. If adhesive, solvent, or sealing compound gets on skin or clothing, wash immediately
with soap and water. Failure to comply may result in injury or death to personnel.
1.
Apply sealing compound to threads of oil sampling valve (Figure 2, Item 4).
1
2, 3
4
Figure 2. Oil Sampling Valve Installation.
2.
Install oil sampling valve (Figure 2, Item 4) on drain plug (Figure 2, Item 2).
3.
Install oil sampling valve (Figure 2, Item 4), drain plug (Figure 2, Item 2), and gasket (Figure 2, Item 3) onto oil
pan (Figure 2, Item 1).
END OF TASK
FOLLOW-ON MAINTENANCE
END OF TASK
END OF WORK PACKAGE