• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Engine Off/Battery Drain Indicator - Step 2.
Figure 4. Work Light Harness Connector Pin 2 - Step 4.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  126    127    128    129    130  131  132    133    134    135    136  
img
. .
TM 5-3825-270-23&P
0025
WORK LIGHT
HARNESS CONNECTOR
PIN 1
PIN 2
(RED WIRE)
(BLACK WIRE)
Figure 3. Work Light Harness Connector Pin 1 - Step 3.
4.
Place black multimeter probe to know good ground.
5.
Note multimeter reading.
CONDITION/INDICATION
Are 22 to 28 VDC measured at work light harness connector pin 1?
DECISION
No - Go to step 5. (Step 5 - Are less than 200 ohms measured across LIGHTS switch terminal 1 and terminal 2
with switch in ON position?)
Yes - Go to step 4. (Step 4 - Are less than 200 ohms measured at work light harness connector pin 2 to known
good ground?)
STEP 4
Are less than 200 ohms measured at work light harness connector pin 2 to known good ground?
1.
Push in EMERGENCY STOP switch to off position. (TM 5-3825-270-10)
2.
Disconnect batteries. (WP 0085)
3.
Set multimeter to measure continuity.
CAUTION
Ensure electrical power is off prior to working on all electrical connections. Failure to comply
may result in damage to equipment.
4.
Place red multimeter probe to work light harness connector pin 2.
0025-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.