TM 5-3820-276-10-2
0200
Table 4.
PMCS - MCS - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
2
WWDS00970
Figure 22. Hydraulic Control Manifold, Levers, Pump, and Hoses.
2. Check hydraulic control manifold (Figure 22, Item 2), Hydraulic control manifold
levers, and hoses for damage, leaks, or missing
or hoses leaking, or
hardware.
missing hardware. Notify
maintenance.
3. Check gauges for damage.
Gauge damaged. Notify
maintenance.
NOTE
11
Before
Shaker Grease
Fittings
Shaker grease fittings are located on both
sides of MCS and both grease fittings are to
be lubricated. Left side shown.
Lubricate shaker grease fittings (Figure 23, Item 1) with
02/13/2013root(pmcswp)wpno(I40001)