TM 5-3820-276-10-2
0200
Table 4.
PMCS - MCS - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
WWDS00718
Figure 16. Engine Coolant.
NOTE
5
Before
Muffler and
Exhaust Pipe
Operating vehicle with any exhaust leaks
1. Inspect exhaust pipe (Figure 17, Item 1) for damage. Any damage evident.
Notify maintenance.
1
2
WWDS00719
2. Inspect muffler (Figure 17, Item 2) for damage or
Any damage or leak
evidence of leaks.
evident. Notify
maintenance.
6
Before
Engine Cooling
1. Remove left-side engine cover panel.
Fan
02/13/2013root(pmcswp)wpno(I40001)