TM 5-3820-276-10-2
0200
Table 4.
PMCS - MCS - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
2
3
WWDS00721
Figure 19. Batteries, Cables, and Hold-Down.
2. Install left-side engine cover panel.
8
Before
Work Lights
1. Set LIGHTS switch (Figure 20, Item 2) up to ON
position.
02/13/2013root(pmcswp)wpno(I40001)