• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Support Bracket Brace Installation.
Figure 13. Rod Handling Arm.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  384    385    386    387    388  389  390    391    392    393    394  
img
.
TM 5-3820-276-10-1
0030
ROD HANDLING ARM SUPPORT BRACKET INSTALLATION - Continued
19.
With aid of an assistant, pull main winch control (Figure 12, Item 5) back and lower jib cable
(Figure 12, Item 1) and hook (Figure 12, Item 2).
1
2
3
4
5
WWDS00825
Figure 12. Nylon Sling Removal.
20.
With aid of assistant, remove nylon strap (Figure 12, Item 3) from jib cable hook (Figure 12, Item 2) and rod
handling arm support bracket (Figure 12, Item 4). Place jib cable hook in safe operating location.
0030-14
02/13/2013root(opusualwp)wpno(O10017)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.