TM 5-3820-276-10-1
0024
STORING DRILL ROD WITH PENDANT
1.
Set and hold PIPE ARM ELEVATION switch (Figure 32, Item 3) up in RAISE position to move automated
rod handling arm (Figure 32, Item 4) to upright position.
1
2
4
3
WWDS00555
Figure 32. Storing Drill Rod With Pendant Operation.
2.
Set and hold PIPE ARM ROTATE switch (Figure 32, Item 2) to down position to move clamps
(Figure 32, Item 1) inward.
02/13/2013root(opusualwp)wpno(O10010)