• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WATER INJECTION PUMP (25 GPM) OPERATION - WATER WELL DRILLING RIG (WWDR)
Figure 2. Water/Foam Injection Suction Valve (Shown Open)

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  201    202    203    204    205  206  207    208    209    210    211  
img
.
TM 5-3820-276-10-1
0021
WWDR 25 GPM WATER INJECTION PUMP SERVICE WATER OPERATION - Continued
1
2
3
5
4
WWDS00137
Figure 1.
Suction Hose Connection.
2.
Place opposite end of 2in. suction hose (Figure 1, Item 5) into suitable container (Figure 1, Item 4).
3.
Connect water washdown hose (Figure 1, Item 3) to 25 gpm injection pump service water hose port
(Figure 1, Item 2).
0021-2
02/13/2013root(opusualwp)wpno(O10008)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.