• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WWDR FRONT BUMPER WINCH OPERATION - Continued
WATER INJECTION PUMP (25 GPM) OPERATION - WATER WELL DRILLING RIG (WWDR)

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  199    200    201    202    203  204  205    206    207    208    209  
img
. .
TM 5-3820-276-10-1
0020
DISENGAGE P.T.O.
1.
Depress clutch pedal (Figure 5, Item 1).
2
3
1
4
WWDS01031
Figure 5.
Front Bumper Mounted Winch Cab Controls Location.
2.
Push button (Figure 5, Item 2) and move P.T.O. lever (Figure 5, Item 3) to OUT position to disengage
P.T.O.
3.
Check P.T.O. ENGAGED light (Figure 5, Item 4). Light will go out when P.T.O. is disengaged.
4.
Slowly release clutch pedal (Figure 5, Item 1).
5.
Shut down WWDR (WP 0012).
END OF TASK
END OF WORK PACKAGE
0020-7/blank
02/13/2013root(opusualwp)wpno(O10007)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.