TM 5-3820-276-10-1
OPERATOR MAINTENANCE
WATER INJECTION PUMP (25 GPM) OPERATION - WATER WELL DRILLING RIG (WWDR)
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
20-ft X 2-in. Combination Suction/Fill Hoses
(2 Ea) (Volume 2, WP 0231, Table 1, Item 9)
Hose, Water Washdown
(Volume 2, WP 0231, Table 1, Item 38)
Personnel Required
Two
WWDR 25 GPM WATER INJECTION PUMP SERVICE WATER OPERATION
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel toe
shoes during operation of the Water Well Drilling System. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
1.
With aid of assistant, connect 2in. suction hose (Figure 1, Item 5) to 25 gpm water injection pump
(Figure 1, Item 1).