TM 10-4930-236-13&P4-16. ON-OFF CABLE ASSEMBLYThis task consists of:a.Removalb.Testc.Disassemblyd.Repaire.Assemblyf.InstallationINITIAL SETUPToolsRequiredGeneral Mechanic Tool Kit (Appendix B, Section III, Item 3)Soldering Gun (Appendix B, Section III, Item 12)Materials/PartsRequiredSolder (Appendix E, Section II, Item 3)EquipmentConditionPumping Unit ShutdownGeneralSafetyInstructionsWARNINGAvoid breathing fumes generated by soldering.REMOVALDisconnect cable (1) from junction box (2).TESTTest for continuity with switch in ON position. If reading is more than 5 Ohms, replace the cable ordefective connector.DISASSEMBLYa.Loosen screws (3) and unscrew body (4) from alinement barrel (7).b.Slide body (4), metal collar (5) and plastic collar (6) back on cable.c.Pull off alinement barrel (7) and rubber isolator (8).d.Tag and unsolder leads (9) from pins (10).REPAIRa.Inspect the cable for breaks or cuts. If the cable is damaged near the connector, cut the cable abovethe damage and trim back the outer insulation approximately 1/2 inch. Trim insulation on each lead to exposeapproximately 1/4 inch of wire.b.Inspect the connector components (3-8) for damage. Replace connector if damaged.ASSEMBLYa.Slide body (4), metal collar (5) and plastic collar (6) onto cable, if removed.4-36
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business