TM 10-4930-236-13&P4-14. CENTRIFUGAL PUMP MAINTENANCEThis task consists of:a.RepairINITIAL SETUPToolsRequiredGeneral Mechanic Tool Kit (Appendix B, Section III, Item 3)Materials/PartsRequiredCheck Valve Assembly (Appendix F)EquipmentConditionPump Unit ShutdownGeneralSafetyInstructionsWARNINGDo not smoke within 50 feet (15.34 meters) of the Tank and Pump Unit.REPAIRa.Remove nuts (1) and disconnect flange (2) with elbow and hose attached.b.Remove the check valve assembly (3) from the studs (4). Discard check valve assembly.c.Place new check valve assembly (3) on studs (4).d.Position flange (2) on studs (4) and install nuts (1)4-34
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business