TM 5-4320-300-14Section II. MAINTENANCE PROCEDURESINDEXParaParaAir shutdown solenoid5-8Fuel tank and suction line5-10Alternator assembly5-5Impeller, shaft, seals, andBlower assembly5-9check valve5-21Cooling fan shaft bracket, shaftMain wiring harness5-7assembly, and pulley5-17Mechanical governor5-15Cylinder head and block5-18Overspeed governor5-14Engine assembly5-16Pump assembly5-20Exhaust heat shield5-4Starter motor assembly5-6Fuel control tube assembly5-13Suction and discharge gage valves,Fuel injectors5-12lines, hoses, and fittings5-19Fuel pump assembly5-11Trailer assembly5-225-3. GENERAL INSTRUCTIONSMost maintenance instructions in this section will list resources required, personnel required, and equipment condition forthe start of the procedure. Note the following:Resources required are not listed unless they apply to the procedure.Personnel required are listed only if the task requires more than one. If PERSONNEL is not listed, it means oneperson can do the task.The normal standard equipment condition to start a maintenance task is engine stopped and battery disconnectswitch off. EQUIPMENT CONDITION is not listed unless some other condition is required besides the power being off.5-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business