TM 5-4320-300-14
Section II. MAINTENANCE PROCEDURES
INDEX
Para
Para
Air shutdown solenoid
5-8
Fuel tank and suction line
5-10
Alternator assembly
5-5
Impeller, shaft, seals, and
Blower assembly
5-9
check valve
5-21
Cooling fan shaft bracket, shaft
Main wiring harness
5-7
assembly, and pulley
5-17
Mechanical governor
5-15
Cylinder head and block
5-18
Overspeed governor
5-14
Engine assembly
5-16
Pump assembly
5-20
Exhaust heat shield
5-4
Starter motor assembly
5-6
Fuel control tube assembly
5-13
Suction and discharge gage valves,
Fuel injectors
5-12
lines, hoses, and fittings
5-19
Fuel pump assembly
5-11
Trailer assembly
5-22
5-3. GENERAL INSTRUCTIONS
Most maintenance instructions in this section will list resources required, personnel required, and equipment condition for
the start of the procedure. Note the following:
Resources required are not listed unless they apply to the procedure.
Personnel required are listed only if the task requires more than one. If PERSONNEL is not listed, it means one
person can do the task.
The normal standard equipment condition to start a maintenance task is engine stopped and battery disconnect
switch off. EQUIPMENT CONDITION is not listed unless some other condition is required besides the power being off.
5-6