• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Folding Hand Rail Disassembly.
Figure 7. Folding Hand Rail Disassembly.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  1009    1010    1011    1012    1013  1014  1015    1016    1017    1018    1019  
img
.
TM 5-3825-270-23&P
0185
DISASSEMBLY - Continued
22
23
Figure 5. Folding Hand Rail Disassembly.
5.
Remove two locknuts (Figure 6, Item 28), two screws (Figure 6, Item 24), two snap pin lanyards (Figure 6,
Item 25), six washers (Figure 6, Item 27), two bearing sleeves (Figure 6, Item 26), and two midrail plates (Figure
6, Item 16) from two rear upright rails (Figure 6, Item 23). Discard locknuts.
24, 25, 26
27
28
16
23
Figure 6. Folding Hand Rail Disassembly.
6.
Remove two locknuts (Figure 7, Item 29), two screws (Figure 7, Item 31), two bearing sleeves (Figure 7, Item
32), eight washers (Figure 7, Item 30), and two rear upright rails (Figure 7, Item 23) from upper rail (Figure 7,
Item 21). Discard locknuts.
0185-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.