• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Folding Hand Rail Assembly Removal.
Figure 5. Folding Hand Rail Disassembly.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  1008    1009    1010    1011    1012  1013  1014    1015    1016    1017    1018  
img
.
TM 5-3825-270-23&P
0185
DISASSEMBLY - Continued
1.
Remove two locknuts (Figure 3, Item 14), six washers (Figure 3, Item 13), and two screws (Figure 3, Item 12)
from walkway pivoting rail (Figure 3, Item 15) and midrail plate (Figure 3, Item 16). Discard locknuts.
13
13
12
14
15
16
Figure 3. Folding Hand Rail Disassembly.
2.
Remove two locknuts (Figure 4, Item 17), six washers (Figure 4, Item 18), two bearing sleeves (Figure 4, Item
19), and two screws (Figure 4, Item 20) from walkway pivoting rail (Figure 4, Item 15) and upper rail (Figure
4, Item 21). Discard locknuts.
15 17
18
19
18 20
21
Figure 4. Folding Hand Rail Disassembly.
3.
Remove upper rail (Figure 4, Item 21) from walkway pivoting rail (Figure 4, Item 15).
4.
Remove two snap pins (Figure 5, Item 22) from rear upright rails (Figure 5, Item 23).
0185-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.