• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Alternator Installation.
BATTERIES SERVICING AND TESTING

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  471    472    473    474    475  476  477    478    479    480    481  
img
. . .
TM 5-3825-270-23&P
0081
INSTALLATION - Continued
1
2
3
6
4
5
Figure 8. Alternator Installation.
5.
Connect connector (Figure 8, Item 2) to alternator (Figure 8, Item 3).
6.
Connect connector (Figure 8, Item 4) to alternator (Figure 8, Item 3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install alternator belt. (WP 0085)
2.
Connect batteries. (WP 0085)
END OF TASK
END OF WORK PACKAGE
0081-5/6 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.