• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Interconnect Terminal Strip - Step 2.
Figure 5. Engine Off/Battery Drain Indicator - Step 5.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  173    174    175    176    177  178  179    180    181    182    183  
img
.
TM 5-3825-270-23&P
0032
INSIDE OF
15-AMP
CONTROL PANEL
CIRCUIT BREAKER
20
1
1
15
5
5
EMERGENCY
10
10
10
STOP SWITCH
5
15
15
1
20
20
INTERCONNECT
POSITIVE
NEGATIVE
TERMINAL STRIP
TERMINAL STRIP
TERMINAL STRIP
Figure 3. Interconnect Terminal Strip - Step 3.
3.
Disconnect white/black wire at interconnect terminal strip terminal 9.
4.
Disconnect white/red wire at interconnect terminal strip terminal 10.
5.
Set multimeter to measure continuity.
NOTE
This test is checking for a short. Continuity should not be present on wire(s) being tested to
ground. If continuity is present a short to ground condition exists.
6.
Connect red multimeter probe to disconnected white/red wire at interconnect terminal strip, terminal 10.
Figure 4. Interconnect Terminal Strip Terminals 9 And 10 - Step 3.
7.
Connect black multimeter probe to known good ground.
8.
Note multimeter reading.
0032-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.