• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION FOR TRANSPORT
Figure 3. Placing Water Distributor Back In Service After Highway, Rail, Or Fixed Wing Air Transport.

Technical Manual For Engineer Mission Module - Water Distributor Page Navigation
  322    323    324    325    326  327  328    329    330    331    332  
img
. . .
TM 5-3825-270-10
0074
PREPARATION FOR HIGHWAY, RAIL, OR FIXED WING AIR TRANSPORT - Continued
2
1
Figure 1. Preparation For Highway, Rail, Or Fixed Wing Air Transport.
6.
Ensure folding hand rail is stowed (WP 0077).
7.
Ensure manhole cover is closed (WP 0080).
NOTE
Water turret should be stowed as depicted in Figure 2 for ALL modes of transport.
8.
Install connection point cap (Figure 2, Item 2).
1
2
Figure 2. Preparation For Highway, Rail, Or Fixed Wing Air Transport.
END OF TASK
0074-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.