SPECIAL SERVICE INSTRUCTIONS
PREPARATION FOR TRANSPORT

Technical Manual For Engineer Mission Module - Water Distributor Page Navigation
  320    321    322    323    324  325  326    327    328    329    330  
img
. .
TM 5-3825-270-10
0073
OPERATOR MAINTENANCE
BACK FLUSHING
INITIAL SETUP:
Equipment Condition
Engine OFF.
BACK FLUSHING
NOTE
Water Distributor should have a minimum of 300 gallons of water for back flushing,
1.
Remove connection point cover C1 (Figure 1, Item 2).
1
2
Figure 1. Back Flushing.
2.
Open valve V1 (Figure 1, Item 1). Allow fluid to drain until flow appears unrestricted.
3.
Close valve V1 (Figure 1, Item 1).
4.
Install connection point cover C1 (Figure 1, Item 2).
5.
If back flushing fails to clear strainer, notify Field Maintenance to service strainer.
END OF TASK
END OF WORK PACKAGE
0073-1/2 blank