• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PLACING WATER DISTRIBUTOR BACK IN SERVICE AFTER HIGHWAY, RAIL, OR FIXED WING AIR TRANSPORT
Figure 2. Unstow Rollers.

Technical Manual For Engineer Mission Module - Water Distributor Page Navigation
  325    326    327    328    329  330  331    332    333    334    335  
img
. . .
TM 5-3825-270-10
0075
OPERATOR MAINTENANCE
STOW/UNSTOW ROLLERS
INITIAL SETUP:
Equipment Condition
Water Distributor loaded on PLS (WP 0007)
STOW
1.
Remove two holding pins (Figure 1, Item 1) from retaining pins (Figure 1, Item 2).
2
1
4
VIEW FROM
3
UNDERNEATH
REAR VIEW
5
Figure 1. Stow Rollers.
2.
Remove two retaining pins (Figure 1, Item 2) and roller (Figure 1, Item 3) from frame (Figure 1, Item 4).
3.
Position roller (Figure 1, Item 3) on roller stowage bracket (Figure 1, Item 5) and install two retaining pins
(Figure 1, Item 2).
4.
Install two holding pins (Figure 1, Item 1) in retaining pins (Figure 1, Item 2).
END OF TASK
UNSTOW
1.
Remove two holding pins (Figure 2, Item 1) from retaining pins (Figure 2, Item 2).
0075-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.