TM 5-3820-276-10-2
0225
PREPARATION FOR USE GROUTER
1.
Position main grout hose (Figure 28, Item 1) inside suitable container.
1
WWDS00981
Figure 28. Main Grout Hose.
2.
Start engine (Volume 1, WP 0040).
3.
Set THROTTLE CONTROL switch (Figure 29, Item 1) to ON position.
1
WWDS00609
Figure 29. Throttle Control Switch.
02/13/2013root(maintwp)wpno(M20008)