Figure 28. Main Grout Hose.
PREPARATION FOR USE GROUTER - Continued

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  696    697    698    699    700  701  702    703    704    705    706  
img
.
TM 5-3820-276-10-2
0225
PREPARATION FOR USE GROUTER - Continued
4.
Set Grout Pump Auto switch (Figure 30, Item 6) up to ON position.
2
3
1
4
5
6
7
WWDS00350
Figure 30. Pumping Propylene Glycol Out.
5.
Open main grout discharge valve (Figure 30, Item 7).
WARNING
Make sure to use personal protective equipment (gloves, goggles) and follow local
guidelines for fluid spill protection. Failure to comply may result in injury or death to
personnel. Seek medical attention in the event of an injury.
NOTE
Make sure both cylinders are pumping fluid. If only one cylinder is pumping, the pump must
be cleaned.
6.
Push GROUT PUMP flow divider lever (Figure 30, Item 1) up towards MAX. position to pump propylene
glycol out into suitable container.
7.
Pull GROUT PUMP flow divider lever (Figure 30, Item 1) down to OFF position after pumping out
approximately 5 gallons (19 L) of propylene glycol.
0225-31
02/13/2013root(maintwp)wpno(M20008)


Privacy Statement