• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 23. Cycling Propylene Glycol.
Figure 25. Desander Pump Drain Plug Installation.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  691    692    693    694    695  696  697    698    699    700    701  
img
.
TM 5-3820-276-10-2
0225
PREPARATION FOR USE WATER WELL DRILLING RIG (WWDR)
1.
Close mud standpipe drain valve (Figure 24, Item 1).
1
WWDS01032
Figure 24. Close Mud Standpipe Drain Valve.
2.
Perform setup procedures for WWDR (Volume 1, WP 0017) as required for drilling operation.
WARNING
Make sure to use personal protective equipment (gloves, goggles) and follow local
guidelines for fluid spill protection. Failure to comply may result in injury or death to
personnel. Seek medical attention in the event of an injury.
3.
Perform water injection pump (25 gpm) operation procedures (Volume 1, WP 0021) to flush propylene glycol
from water injection pump into suitable container.
END OF TASK
PREPARATION FOR USE WATER WELL SUPPORT VEHICLE (WWSV)
1.
Fill water tank (Volume 1, WP 0062).
0225-26
02/13/2013root(maintwp)wpno(M20008)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.