TM 5-3820-276-10-2
0200
Table 5.
PMCS - MCS - During Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
WWDS00726
Figure 37. Hydraulic Oil Level.
4
During
Mud Pump
Lubricate three mud pump shaft grease fittings (Figure
Grease Fittings
38, Item 1) with two pumps of grease (WP 0233) every
hour of operation.
1
WWDS00731
Figure 38. Mud Pump Shaft Grease Fittings.
02/13/2013root(pmcswp)wpno(I40001)