TM 5-3820-276-10-2
0200
Table 4.
PMCS - MCS - Before Drilling Equipment Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
2
WWDS00729
Figure 30. Engine Wiring and Fuel Line Connections.
2. Check fuel lines (Figure 30, Item 2) for leaks or
Fuel lines leaking or
damage.
damaged. Notify
maintenance.
19
Before
1. Check fan/alternator belt (Figure 31, Item 2) for
Fan/alternator belt loose
Belt and Fan
tension and fraying.
or frayed. Notify
Guard
maintenance.
1
2
WWDS00730
2. Check fan guard (Figure 31, Item 1) for obstructions
Fan guard damaged.
or damage. Remove any obstructions.
Notify maintenance.
3. Install right-side engine cover panel.
20
Before
Mud Pump
Lubricate three mud pump shaft grease fittings (Figure
Grease Fittings
02/13/2013root(pmcswp)wpno(I40001)