• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COLD WEATHER STARTING PROCEDURES - WATER WELL DRILLING RIG (WWDR) AND WATER WELL SUPPORT VEHICLE (WWSV) - Continued
Figure 2. Assist Vehicle Slave Receptacle Cover Removal

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  638    639    640    641    642  643  644    645    646    647    648  
img
. . . .
TM 5-3820-276-10-1
0064
OPERATOR MAINTENANCE
SLAVE RECEPTACLE STARTING PROCEDURES - PORTABLE AIR COMPRESSOR (PAC)
INITIAL SETUP:
Tools and Special Tools
References
NATO Slave Cable
WP 0059
(Volume 2, WP 0231, Table 1, Item 46)
Equipment Condition
Personnel Required
Wheels chocked (WP 0015)
Two
PAC SLAVE RECEPTACLE STARTING PROCEDURES
NOTE
In this procedure Water Well Drilling Rig (WWDR) is being shown as an assist vehicle.
1.
With aid of an assistant, move assist vehicle into position beside PAC so slave receptacles are side by side.
2.
Place transmission shift lever (Figure 1, Item 1) of assist vehicle in Neutral.
1
2
WWDS00220
Figure 1.
Positioning of Assist Vehicle.
3.
Pull PARKING BRAKE valve (Figure 1, Item 2) up to set parking brake on assist vehicle.
0064-1
02/13/2013root(opunuwp)wpno(O30010)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.