• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Water Tank Fill Cap and Stand Pipe
Figure 4. Water Tank Fill Cap Installation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  630    631    632    633    634  635  636    637    638    639    640  
img
.
TM 5-3820-276-10-1
0062
WWSV WATER TANK FILLING PROCEDURE - Continued
5.
Open water tank vent valve (Figure 3, Item 1).
1
3
2
WWDS00931
Figure 3.
Water Tank Vent Valve (Shown in Closed Position) and Water Tank Gauge.
6.
Rotate water tank gauge cover (Figure 3, Item 3) up to show water tank gauge (Figure 3, Item 2).
7.
Fill water tank until gauge (Figure 3, Item 2) indicates water tank is full.
8.
Rotate water tank gauge cover (Figure 3, Item 3) down to cover water tank gauge (Figure 3, Item 2).
0062-4
02/13/2013root(opusualwp)wpno(O20024)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.