TM 5-3820-276-10-1
0060
POST OPERATION CONFIGURATION OF PAC - Continued
8.
Install cap (Figure 4, Item 1) to Water Well Drilling Rig (WWDR) air standpipe (Figure 4, Item 2).
1
2
WWDS00404
Figure 4.
WWDR Air Standpipe.
9.
If required, with aid of an assistant, connect PAC to tow vehicle (WP 0057).
END OF TASK
END OF WORK PACKAGE