• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Hose Removal from Air Standpipe
PORTABLE WATER TANK SETUP AND POST OPERATION PROCEDURES

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  623    624    625    626    627  628  629    630    631    632    633  
img
. .
TM 5-3820-276-10-1
0060
POST OPERATION CONFIGURATION OF PAC - Continued
8.
Install cap (Figure 4, Item 1) to Water Well Drilling Rig (WWDR) air standpipe (Figure 4, Item 2).
1
2
WWDS00404
Figure 4.
WWDR Air Standpipe.
9.
If required, with aid of an assistant, connect PAC to tow vehicle (WP 0057).
END OF TASK
END OF WORK PACKAGE
0060-4
02/13/2013root(opusualwp)wpno(O30011)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.