TM 5-3820-276-10-1
OPERATOR MAINTENANCE
INITIAL SETUP:
Personnel Required
Equipment Condition
Two
Water Well Support Vehicle (WWSV) in post
PAC in post operation configuration (WP 0060)
References
CONNECTING PAC TO TOW VEHICLE
WARNING
Always wear double hearing protection, safety glasses, hard hat, gloves, and steel
toe shoes during operation of the Water Well Drilling System. Failure to comply
may result in injury or death to personnel. Seek medical attention in the event of an
injury.
Do not put hands near pintle hook while aligning or connecting trailer tongue or tow
bar. Hands and fingers can be pinched or crushed. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
Always use additional personnel as a guide when connecting tow vehicle to trailer.
Guide must not be positioned between tow vehicle and trailer. Failure to comply
may result in injury or death to personnel. Seek medical attention in the event of an
injury.
CAUTION
Always use tow vehicle equipped to tow and has electronic braking capability. Failure to
comply may result in damage to equipment.
1.
With aid of an assistant, align tow vehicle (Figure 1, Item 1) with PAC (Figure 1, Item 2).
0057-1
02/13/2013root(opusualwp)wpno(O30006)