POST OPERATION PROCEDURES - WELDER/GENERATOR
AUXILIARY FUEL TRANSFER PUMP OPERATION - WATER WELL SUPPORT VEHICLE (WWSV)

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  507    508    509    510    511  512  513    514    515    516    517  
img
.
TM 5-3820-276-10-1
0046
WELD OUTPUT CABLE TO TERMINAL DETACHMENT - Continued
2
1
3
8
4
7
5
6
WWDS00255
Figure 1.
WORK and ELECTRODE Cable Removal.
2.
Remove nut (Figure 1, Item 3) from ELECTRODE terminal stud (Figure 1, Item 4).
3.
Remove electrode cable (Figure 1, Item 5) from ELECTRODE terminal stud (Figure 1, Item 4).
4.
Install nut (Figure 1, Item 3) on ELECTRODE terminal stud (Figure 1, Item 4).
5.
Remove nut (Figure 1, Item 7) from WORK terminal stud (Figure 1, Item 8).
6.
Remove work cable (Figure 1, Item 6) from WORK terminal stud (Figure 1, Item 8).
7.
Install nut (Figure 1, Item 7) on WORK terminal stud (Figure 1, Item 8).
8.
Close the WORK terminal door (Figure 1, Item 1) and ELECTRODE terminal door (Figure 1, Item 2).
END OF TASK