• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Handrail Hand Cranks Removal.
Figure 15. Ladder.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  413    414    415    416    417  418  419    420    421    422    423  
img
.
TM 5-3820-276-10-1
0032
DOWNRIGGER SETUP
WARNING
Always stay clear of the downriggers during operation. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
NOTE
The use of wood dunnage under support pad of downrigger is recommended to
prevent shifting once supported.
Downrigger control levers must be held in position to operate and are spring
loaded to the Neutral position.
Downrigger controls should be operated in pairs. Both front controls and both rear
controls should be operated together.
1.
Pull FRONT LEFT DOWNRIGGER (Figure 14, Item 1) lever and FRONT RIGHT DOWNRIGGER
(Figure 14, Item 3) lever to DOWN position until downrigger has made contact with ground.
1
2
3
4
WWDS00266
Figure 14. Downrigger Controls.
2.
Pull REAR LEFT DOWNRIGGER (Figure 14, Item 2) lever and REAR RIGHT DOWNRIGGER
(Figure 14, Item 4) lever to DOWN position until downrigger has made contact with ground.
0032-16
02/13/2013root(opusualwp)wpno(O20002)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.