TM 5-3820-276-10-1
0029
REAR WORK PLATFORMS POST OPERATION
1.
With aid of an assistant, raise right-side work platform (Figure 17, Item 2).
1
3
2
WWDS00228
Figure 17. Right-Side Work Platform.
2.
With aid of an assistant, install two pins (Figure 17, Item 1) to right-side work platform (Figure 17, Item 2).
3.
Install two safety pins (Figure 17, Item 3) to pins (Figure 17, Item 1).
0029-20