Figure 3. Drill Pipe Casing Sling Installation
DRILL ROD STORAGE CARTRIDGE LOADING - Continued

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  219    220    221    222    223  224  225    226    227    228    229  
img
.
TM 5-3820-276-10-1
0023
DRILL ROD STORAGE CARTRIDGE LOADING - Continued
10.
If required, lift drill rod (Figure 3, Item 6) to install nylon web slings (tag lines) (Figure 3, Items 5 and 7) to
drill rod (Figure 3, Item 6).
NOTE
When loading drill rod storage cartridges, fill inner cartridge first.
11.
Set and hold PIPE STORAGE CARTRIDGES INNER switch (Figure 4, Item 10) to right position to move drill
rod storage cartridge (Figure 4, Item 7) over lifting beam (Figure 4, Item 5).
1
2
3
11
3
4
8
7
6
5
9
10
WWDS01022
Figure 4.
Loading Drill Rod Cartridges.
0023-5