TM 10-4930-236-13&P
4-18. ADAPTER HALF MAINTENANCE
This task consists of: a. Removal
b.
Disassembly
c.
Repair
d. Assembly.
e.
Installation
INITIAL SETUP
Tools Required
General Mechanic Tool Kit (Appendix B, Section III, Item 3)
Spanner Wrench (Appendix B, Section III, Item 8)
Vise (Appendix B, Section III, Item 2)
Materials/Parts Required
Drycleaning Solvent (Appendix E, Section II, Item 1)
Sealing Compound (Appendix E, Section II, Item 6)
Tape, Anti-seize (Appendix E, Section II, Item 4)
Rags, Wiping (Appendix E, Section II, Item 13)
Seal (1) (Appendix F)
Equipment Condition
Pumping Unit Shutdown
Fuel Evacuated from Lines and Manifold
General Safety Instructions
WARNING
Do not smoke within 50 feet (15.34 meters) of the Tank and
Pump Unit.
Dry cleaning solvent is potentially dangerous to personnel and
property.
REMOVAL
a.
Pull out on cam lock handles (1) on bottom loading manifold coupling half (2).
b.
Remove the adapter half (3) from the manifold coupling half (2).
DISASSEMBLY
NOTE
Discard all mandatory replacement parts.
a.
Pull out on cam lock handles (4) of dust cap (5) and remove dust cap with gasket (6).
b.
Unscrew and remove coupling half (7).
c.
Remove pipe end (8), seal (9) and spring (10) from adapter end (11).
d.
Remove the disc assembly (12).
e.
Unscrew stem (13) and remove spacer (14), washer (15) and disc (16) from holder (17).
REPAIR
a.
Cleaning and Inspection.
4-42