TM 10-4930-236-13&P
4-19. BOTTOM LOADING MANIFOLD MAINTENANCE
This task consists of: a. Removal
b.
Disassembly
c.
Repair
d. Assembly.
e.
Installation
INITIAL SETUP
Tools Required
General Mechanic Tool Kit (Appendix B, Section III, Item 3)
Helicoil I and Removal Tool (Appendix B, Section III, Item 2)
Materials/Parts Required
Drycleaning Solvent (Appendix E, Section II, Item 1)
Rags, Wiping (Appendix E, Section II, Item 13)
Lockwashers (4) (Appendix F)
Equipment Condition
Pumping Unit Shutdown
Fuel Evacuated from Manifold
EMD Pump Assembly Removed (paragraph 4-13)
Valve Control Cables Disconnected (paragraph 4-17)
Personnel Required
Three (3)
General Safety Instructions
WARNING
Do not smoke within 50 feet (15.34 meters) of the Tank and Pump Unit.
Dry cleaning solvent is potentially dangerous to personnel and property.
Lifting heavy equipment can cause injury.
REMOVAL
NOTE
Discard all mandatory replacement parts.
a.
Loosen tie downs (1) securing pump unit (2).
4-45