TM 10-4630-206-12&P
SEWAGE EJECTION PUMP (SEP)
SERVICE UPON RECIEPT
GENERAL
Refer to appropriate TMs for associated equipment maintenance instructions. Maintenance instructions
covered in this section are unique to the Sewage Ejection Pump (SEP).
INTRODUCTION TO UNIT MAINTENANCE
This section contains Unit Maintenance applicable to the SEP as authorized by the MAC, WP 0025 00, of
this manual. Unit Maintenance personnel may also perform all functions allocated in Operator
Maintenance.
All maintenance procedures in this section can be performed by one person unless otherwise indicated.
Read all WARNINGS, CAUTIONS, NOTES, and instructions carefully before attempting any procedures.
Read and understand all warnings at the front of this manual.
Each maintenance action will include a heading the lists the actions to be taken, the tools and
parts/materials required, and the condition in which the equipment must be in to perform the action.
SERVICE UPON RECEIPT OF MATERIEL
Inspect equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage on DD Form 6, Packaging Improvement Report.
Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies
in accordance with the instructions of DA PAM 738-751.
Check to see whether the equipment has been modified.
After equipment has been positioned, check all items requiring service and perform Preventive
Maintenance Checks and Services (PMCS).
0013 00-1/(2 Blank)