TM 10-4320-344-242.25.3 PackingofPumpingAssemblyModelUS636HCCD-1. (Continued)Figure 2-192.Install Protective Plywood Cap on Model US636HCCD-1.Refer to MIL-STD-129 for information on marking.2.27a.b.c .d.STORAGE.Store equipment so as to provide maximum protection from the elements and toprovide access for inspection, maintenance, and servicing.Take into account environmental conditions, such as extreme cold or heat, highhumidity, blowing snow, earthquakes, and take adequate precautions.Placement of equipment in administrative storage should be for short periodsof time when a shortage of maintenance effort exists.Items should be inmission readiness within 24 hours or within the time factors as determined bythe directing authority.During the storage period appropriate maintenancerecords will be kept.Before placing equipment in administrative storage, current preventivemaintenance checks and services should be completed, shortcomings anddeficiencies should be corrected, and all modification work orders (MWO’s)should be applied.2-4242.26 MARKING
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business